Rose Paving

4 S.T.E.P.s – ‘E’ is for Execution

This week’s post will address the third step in the four-step program to successful parking lot management; please check back next week for the fourth and final step.

After timetable, the third step is Execution. It is extremely helpful to have on-site project management once work commences.  The same project manager who facilitated the setup, mapping, phasing, scheduling and signage needs should also be on hand to ensure that the project is executed as planned and according to specifications set forth in the bid.

Execution!

Supervising a project not only requires careful monitoring of work, inspecting materials and application methods, taking photos and monitoring traffic flow, but also documenting any concerns as necessary.  Of course, there may be some uncontrollable factors that set back a project, regardless of on-site management.  These delays may be weather related, equipment related, or even site related.  Site delays may happen if workers encounter structural problems beneath the sub base that occurred during original construction.  In these instances, a change-order may be necessary to perform the right repair.  More materials might be needed and a different procedure might even be warranted.  Hiring a trustworthy contractor with project management capabilities to report on these issues as they occur can help save time, money and additional delays.

Share

Contact Us

Related content

CEO Jaron Srain discusses trade jobs

CEO Jaron Srain Discusses the Future of Trade Jobs on FOX 10 Talks 

For years, many students have been told that a four-year college degree is the only path to a successful career. At the same time, industries across the country have faced growing labor shortages as fewer people enter skilled trades. During a recent appearance on FOX 10 Talks, Rose Paving CEO Jaron Srain shared why he believes that mindset…

Image showing proper parking lot sealcoating timing.

Parking Lot Sealcoating Timing: When to Schedule Sealcoating 

For most property managers, asphalt maintenance has to fit around tenants, visitors, deliveries, weather, budgets, and daily traffic. Sealcoating is one of those projects that works best when it is planned before the lot starts looking worn down or becomes harder to protect.  The right timing can help you protect the surface from UV rays, water, oil, and routine wear while…

Image showing asphalt heat damage on pavement due to summer heat.

Asphalt Heat Damage: Protecting Your Parking Lot This Summer 

As temperatures rise, so does the risk of asphalt heat damage across commercial parking lots. Property managers know summer brings its own set of maintenance challenges, and few are as easy to overlook as the effect of prolonged heat on pavement. Understanding how heat affects your lot, and what you can do about it, can save…

Let's Start a Project Proposal