Rose Paving

5 Budget Tips for Property Managers

LeavesHave you noticed?  Leaves are changing colors and falling off trees, the nighttime air is crisp, and days are getting shorter: Autumn is in the air.

If you are like most property and facility managers, you are in the thick of budget planning.  But, don’t fret; the seasoned professionals at Rose Paving are here to help you transition between seasons.

With a tight budget, it can be difficult to allocate funds to parking lot maintenance.  However, every dollar budgeted now for timely pavement maintenance will save four to five dollars in future rehabilitation costs.

Budgeting Tips for Property Managers:

  1. Establishing the need for planning ahead is only the first step.  Next it is important to determine exactly what should be included in a parking lot maintenance budget.  The life expectancy of a well designed, well built, and well maintained asphalt parking lot ranges between 15-20 years.
  2. If pavement is new, a budget should reflect the cost for striping on an annual basis for aesthetics, followed by crack sealing and sealcoating every 2 years.
  3. About every 8-10 years, funds should be budgeted for major restoration: either resurfacing (overlay) or full removal and replacement.
  4. If your parking lot is large, consider phasing repairs over a 2-3 year window.  Address defects in well-traveled areas such as drive lanes and walkways first, while alleviating any liabilities that may be present.
  5. Above all, plan ahead for preventative maintenance.  This will help keep costs down over the long-term.  

Knowing which areas of a lot are problematic lessens the likelihood of unplanned repairs and will help you have a better handle on forecasting and budgeting to maintain your asphalt investment.

Looking for more budget planning advice?  Contact a Rose Paving team member today!  We will evaluate the condition of your parking lot and recommend various treatments options over several years.  Call (888) 773-ROSE or email us here!

 

Share

Contact Us

Related content

CEO Jaron Srain discusses trade jobs

CEO Jaron Srain Discusses the Future of Trade Jobs on FOX 10 Talks 

For years, many students have been told that a four-year college degree is the only path to a successful career. At the same time, industries across the country have faced growing labor shortages as fewer people enter skilled trades. During a recent appearance on FOX 10 Talks, Rose Paving CEO Jaron Srain shared why he believes that mindset…

Image showing proper parking lot sealcoating timing.

Parking Lot Sealcoating Timing: When to Schedule Sealcoating 

For most property managers, asphalt maintenance has to fit around tenants, visitors, deliveries, weather, budgets, and daily traffic. Sealcoating is one of those projects that works best when it is planned before the lot starts looking worn down or becomes harder to protect.  The right timing can help you protect the surface from UV rays, water, oil, and routine wear while…

Image showing asphalt heat damage on pavement due to summer heat.

Asphalt Heat Damage: Protecting Your Parking Lot This Summer 

As temperatures rise, so does the risk of asphalt heat damage across commercial parking lots. Property managers know summer brings its own set of maintenance challenges, and few are as easy to overlook as the effect of prolonged heat on pavement. Understanding how heat affects your lot, and what you can do about it, can save…

Let's Start a Project Proposal