Rose Paving

Maintenance Madness

maintenance madnessWe’re fast approaching Maintenance Madness, oops, I mean March Madness!  There will be cheering, jeering, underdogs, and favored teams all competing in game-after-game of college hoops.  A fun time for all…  Or, is it?  Unfortunately, this month is also known for other opponents.  Snow, ice, and excess rainwater wreak havoc on pavement causing maintenance madness in March.  Fortunately, we’ve got the number-one defense: asphalt removal and replacement.

Water that is trapped beneath the surface of pavement expands and contracts with changing weather conditions. This widens existing cracks and may even result in pavement heaving and large potholes.  Guard against these pavement liabilities with proactive procedures designed to help keep your properties in top condition so your customers, like the collegiate athletes, can drive with ease.

Removal and replacement is the best, long-term solution for potholes, pavement heaving, rutting, and broken/damaged asphalt or concrete.  Areas are saw-cut or milled and the existing deteriorated asphalt is removed to the approximate specified depth. Existing stone base is compacted and tack coat is applied to the perimeter of patches to guarantee proper bonding.  Hot asphalt is installed and compacted with a multi-ton vibratory roller and/or vibratory plate.

Infrared asphalt repair is another option well suited for defects near transitional areas where asphalt meets concrete, areas around catch basins, or for rough surfaces in drive lanes or parking stalls.  This technology blends new hot-mix asphalt into the original pavement to create a seamless restoration.  Damaged asphalt is heated to 325 degrees for 5 or 10 minutes, raked to remove failed aggregate, and sprayed with a rejuvenator to replenish lost oils due to oxidation.  Once the material has been placed, it is compacted by vibratory plates.

Act now before liabilities turn into lawsuits!  Contact your Rose Paving representative today and leave the “Madness” to the pros!

Share

Contact Us

Related content

CEO Jaron Srain discusses trade jobs

CEO Jaron Srain Discusses the Future of Trade Jobs on FOX 10 Talks 

For years, many students have been told that a four-year college degree is the only path to a successful career. At the same time, industries across the country have faced growing labor shortages as fewer people enter skilled trades. During a recent appearance on FOX 10 Talks, Rose Paving CEO Jaron Srain shared why he believes that mindset…

Image showing proper parking lot sealcoating timing.

Parking Lot Sealcoating Timing: When to Schedule Sealcoating 

For most property managers, asphalt maintenance has to fit around tenants, visitors, deliveries, weather, budgets, and daily traffic. Sealcoating is one of those projects that works best when it is planned before the lot starts looking worn down or becomes harder to protect.  The right timing can help you protect the surface from UV rays, water, oil, and routine wear while…

Image showing asphalt heat damage on pavement due to summer heat.

Asphalt Heat Damage: Protecting Your Parking Lot This Summer 

As temperatures rise, so does the risk of asphalt heat damage across commercial parking lots. Property managers know summer brings its own set of maintenance challenges, and few are as easy to overlook as the effect of prolonged heat on pavement. Understanding how heat affects your lot, and what you can do about it, can save…

Let's Start a Project Proposal